Punjab entrepreneur sets up 10-storey building in Mohali in 48 hours

Discussion in 'Punjab, Punjabi, Punjabiyat' started by kds1980, Dec 3, 2012.

  1. kds1980

    kds1980 India
    Expand Collapse
    SPNer

    Joined:
    Apr 4, 2005
    Messages:
    4,502
    Likes Received:
    2,739
    MOHALI (Punjab): It was a promise delivered floor by floor. In just 48 hours, an entrepreneur has constructed a 10-storey building in this suburban town in Punjab.

    The red and grey facade building, Instacon, stood tall on an industrial plot in Mohali, 10 km from Chandigarh, Saturday, two days after Punjab deputy chief minister Sukhbir Singh Badal had laid its foundation stone.

    Work on the building's construction started around 4.30 pm Thursday. By Friday evening, the building saw seven floors in place.


    As the deadline of 48 hours approached, all the 10 storeys of the building were in place even though the glass-panes on the windows and other fittings inside were still being put by the workers and engineers.

    The building used pre-fabricated material, including 200 tonnes of steel.

    "Our effort was to put the 10-storeyed structure in place within 48 hours. We wanted to prove that this could be done. That feat was achieved well within 48 hours. Just some finishing touches remain. This is only a sample structure," an official of Synergy Thrislington infrastructure company told IANS at the site.

    Entrepreneur Harpal Singh, who heads the Rs.1,000-crore infrastructure company, had promised that the 10-storey building would be completed within 48 hours.

    "This will be the first building of its kind in the country to be built in just 48 hours. The model has been cleared for Zone-V seismic area, the highest risk area (for earthquakes)," Harpal Singh, who owns the JW Marriot Hotel in Chandigarh, said here earlier.

    Three floors of the building were constructed in just six hours Thursday.

    Over 200 skilled workers, technicians, engineers and equipment were engaged in the building construction.

    The material being used was manufactured in the past two months in a nearby factory.

    "No bricks and sand has been used. The outer wall is a double-skinned PUF panel. The cost is almost the same as of conventional construction material. It saves a lot of time that goes into construction otherwise," said officials at the site.

    Harpal Singh said that the idea to construct such a building came to him when he was constructing his own house, which took two years to complete - thanks to truant workers.

    Singh's company, Synergy, took over Britain-based Thrislington Products, a re-locatable steel partition manufacturer, to set up the new infrastructure company here.
    http://timesofindia....ow/17443514.cms

    [​IMG]
     
    • Like Like x 2
  2. Loading...


  3. spnadmin

    spnadmin United States
    Expand Collapse
    1947-2014 (Archived)
    SPNer Supporter

    Joined:
    Jun 17, 2004
    Messages:
    14,519
    Likes Received:
    19,173
    I am glad to read the building was cleared for Zone V seismic area. The first thing I thought of when I read the headline was "what if there is an earthquake?" It would be great to have more details about how electricity, water service and plumbing were installed in so short a period of time. But maybe this is modular construction and that is figured out ahead of time and done in a fairly standard way.
     
    • Like Like x 1
  4. kds1980

    kds1980 India
    Expand Collapse
    SPNer

    Joined:
    Apr 4, 2005
    Messages:
    4,502
    Likes Received:
    2,739
    I don't think plumbing , electricity could be installed so shortly .I think they just made the structure
     
    • Like Like x 1
  5. Gyani Jarnail Singh

    Gyani Jarnail Singh Malaysia
    Expand Collapse
    Sawa lakh se EK larraoan
    Mentor Writer SPNer Contributor

    Joined:
    Jul 4, 2004
    Messages:
    7,627
    Likes Received:
    14,203
    and the Foundation Stone laying was DELAYED by 3 hours due to the LATE arrival of Sukhbr Badal....so YES i dont think the Plumbing water electricity will be in time...
    BUT Overall..THIS is a GREAT achievement for PUNJAB...good job.
     
    • Like Like x 2
  6. aristotle

    aristotle
    Expand Collapse
    SPNer Contributor

    Joined:
    May 11, 2010
    Messages:
    1,159
    Likes Received:
    2,655
    ROFL....lol
     
    • Like Like x 1
Since you're here... we have a small favor to ask...

More people are visiting & reading SPN than ever but far fewer are paying to sustain it. Advertising revenues across the online media have fallen fast. So you can see why we need to ask for your help. Donating to SPN's is vote for free speech, for diversity of opinions, for the right of the people to stand up to religious bigotry. Without any affiliation to any organization, this constant struggle takes a lot of hard work to sustain as we entirely depend on the contributions of our esteemed writers/readers. We do it because we believe our perspective matters – because it might well be your perspective, too... Fund our efforts and together we can keep the world informed about the real Sikh Sikhi Sikhism. If everyone who writes or reads our content, who likes it, helps us to pay for it, our future would be much more secure. Every Contribution Matters, Contribute Generously!

    Become a Supporter      ::     Make a Contribution     



Share This Page